Central Kitchen Repipe

by | Nov 6, 2017 | 0 comments

Description

Moreno Valley Unified School District Central Kitchen Sewer Repipe.

Scope

In existing and occupied kitchen Pro-Craft located all underground waste piping, laid out all trenching to be saw cut and demoed. Excavate and repipe portions of existing waste system, install epoxy liner on other section. Backfill, patch all concrete and install epoxy flooring. All work was complete over Summer 2017

  • CategoryEducation k-12
  • LocationMoreno Valley
  • OwnerMVUSD
  • ContractorPro-Craft
  • CompletedSummer 2017